Skip to main content

Anybody wondering why we still have a Water Leak on Riverside Road deteriorating the road at that point?

We can assure you that Luke from Malcolm Ryan Studios has put a lot of effort into having it fixed. He is in continuous contact with Thames Water, but receives nothing than promises. We are not allowed to do something like that ourselves, even if we wanted to. In this case the Fire Brigade also has to be consulted. A nightmare!

However, Thames Water has now given Luke a commitment that it is scheduled for "correlation" between 29th September and 17th October, this is when they "listen" to the water mains to see where the leak is coming from. The saga continues, watch this space!

Return to index